S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.497 | 3224.3 | 1602.4771 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.239 | 2343.8 | 2903.9682 |
3 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 6.928 | 2179.3 | 15098.1904 |
4 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 49.4 | 48.2 | 2381.08 |
5 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 20 | 59.4 | 1188 |
6 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 52.12 | 85.8 | 4471.896 |
7 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet. | 11.178 | 749.8 | 8381.2644 |
8 | White washing whith lime on undecorated wall surfaces (two coats) to give an even shade including thoroughly broomed the surface to remove all dirt, dust, mortar drops and other foreign matter. | 52.12 | 6 | 312.72 |
9 | Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-2 coats | 4.36 | 63.2 | 275.552 |
10 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 2.205 | 440 | 970.2 |
11 | Transportation of sand | 3.213 | 698.76 | 2245.11588 |
12 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 6.928 | 710.4 | 4921.6512 |
13 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti | 4.421 | 97.6 | 431.4896 |
14 | Collection of hard moorum including stacking at quarry. | 1.859 | 390.36 | 725.67924 |
15 | TRANSPOTATION OF CEMENT | 1 | 4000 | 4000 |