State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DHOWAT(P)
Work Code: 1703004037/IF/22012035008903 (Samudayik nadep nirman kushwah mohalla lodi)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2022 Work start date : 5/8/2022
Present status : Existing Proposed Status : Constr of NADEP Compost structure for Individual
Tech Sanction Details
Technical Sanction No. : 037/977 Sanction Date : 11/7/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost SBM scheme2 scheme3 Total
41607 0 0 0 39393 0 0 39400 0 81000
Financial Sanction Details
Financial\Administrative Sanction No: 037/510 Financial\Administrative Sanction Date 12/7/2022
Fin. Sanc. Amt. (in Rs) NREGA:41607 SBM
39393
Scheme 2
0
Scheme 3
0
Total
81000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises9.8148.331453.634
2Cement Mortar 1:8 ( 1 cement, 8 sand )2.181374.652996.737
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil2699.521.658309.2
4Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)271.314.63960.98
5Labour only for dressing stones hammer or rough dressed for C. R. masonry work second sort.109.1840.324402.1376
6Transportation of metal 980019800
Total Activity 81000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL130056500
2CEMENT (Beg)4005020000
3SAND (RATE)110055500
4Stones739317393
Total Material 39400