S.No | Material | Quantity | Unit Price | Total |
1 | 3-Display Board / CIB | 1 | 500 | 500 |
2 | MR14001-Supply of insecticide chlorpyriphos . per pit | 9.27917916 | 377.6 | 3503.818050816 |
3 | MR14003-Supply of 38mm dia 1.50 mtr. Long bamboo sticks to support the plants to safe guard the tree from storm. | 150 | 94.5 | 14175 |
4 | MR14004-Supply of plants through contractor/nursery average rate for sapling above 6 feet height and 2.5 cm caliper size. | 150 | 130 | 19500 |
5 | MR14005-Tractor with tanker charges for watering the plants through tanker one tanker of 4000 ltrs. Water capacity is sufficient for 100 No plants. It will take 3 Hours. Item does not existed in csr 2020 | 0.95583583 | 0 | 0 |
6 | MR1613-Fine Sand | 5.97626278 | 797.59 | 4766.6074307002 |
7 | MR1654-Good earth or fine clay for mud plaster | 5.97626278 | 262.5 | 1568.76897975 |
8 | MR1791-Supplying of farm yard manure duly screened and stacked at site of work. | 42.40821831 | 295 | 12510.42440145 |
9 | MR1792-Loading /Unloading charges | 42.40821831 | 49.65 | 2105.5680390915 |
10 | MR1793-Carriage of manure 5 km lead | 42.40821831 | 182.4 | 7735.259019744 |
11 | MR1794-Preliminary watering Charges 5 cm. layer over the surface .Rate for 100 liter = 0.45 | 9816 | 0.45 | 4417.2 |
12 | MR1796-Tractor with sohaga for Plaughing and draging. Item does not existed in csr 2020 | 0.0144 | 0 | 0 |
13 | MR1797-Supply of selection No. 1 Grass roots one Sqm grass roots cover 7 Sqm Area | 113.14670536 | 55 | 6223.0687948 |
14 | MR1798-application of Urea fertilizer | 0.36 | 592 | 213.12 |
15 | MR1799-Shrubs master for 15 times mowing of lawns with Shrubs master @ two mowings during the months of July, August, September and one mowings each in the remaning months.Shrub master can do 4047 sqm. area in two hours. 2*100*15/4047/8. Item does not existed in csr 2020 | 0.648 | 0 | 0 |