State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: UKASGHAT
Work Code: 1734004009/RC/22012034167631 (सीसीरोड नालीनिर्माण नदीकिनारे पंचपरमेश्‍वर भमका)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 2/10/2012 Work start date : 25/5/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 4888 Sanction Date : 3/11/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
35000 22600 0 0 88800 0 0 112000 0 146400
Financial Sanction Details
Financial\Administrative Sanction No: 5271 Financial\Administrative Sanction Date 7/12/2012
Fin. Sanc. Amt. (in Rs) NREGA:57600 Panchparmeshwar
88800
Scheme 2
0
Scheme 3
0
Total
147000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency156005600
2False work for R.C.C. and P.C.C. work in plinth and foundation150.36125.118810.036
3Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete121836.822041.6
4Transportation of metal 10.954354763.25
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.24.8343510801.05
6Transportation of sand49.0985.864214.8674
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.8.03175.321407.8196
8Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.731.219.7614.64
9Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete28.592435.369625.227
10Site clearance, cutting grass, raking into heaps and removing off the premises2691.4376.6
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work47.667.83227.28
12Collection of soft moorum including stacking at quarry.31.294.22939.04
13Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.18410.71968.8
Total Activity 147000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL24.83176.54382.495
220 mm metal transport24.83395.49817.782
340 mm Metal10.95176.51932.675
4CEMENT(BEGS)240.927566247.5
5Centering and Shuttering150.3678.711833.332
6contengency114601460
7Mixer Machien210002000
8sand cum17.8991.051628.8845
9Transportanion of hard Muram31.252.921651.104
10Transportanion of sand17.8952.92946.7388
11Transportation Cement22.19142.383159.4122
12transportation of 40mm metal10.95395.44329.63
13Vibrator (Per Day)25001000
14साईनबोर्ड 110001000
Total Material 112000