S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 5600 | 5600 |
2 | False work for R.C.C. and P.C.C. work in plinth and foundation | 150.36 | 125.1 | 18810.036 |
3 | Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete | 12 | 1836.8 | 22041.6 |
4 | Transportation of metal | 10.95 | 435 | 4763.25 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms. | 24.83 | 435 | 10801.05 |
6 | Transportation of sand | 49.09 | 85.86 | 4214.8674 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 8.03 | 175.32 | 1407.8196 |
8 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 31.2 | 19.7 | 614.64 |
9 | Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete | 28.59 | 2435.3 | 69625.227 |
10 | Site clearance, cutting grass, raking into heaps and removing off the premises | 269 | 1.4 | 376.6 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 47.6 | 67.8 | 3227.28 |
12 | Collection of soft moorum including stacking at quarry. | 31.2 | 94.2 | 2939.04 |
13 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 184 | 10.7 | 1968.8 |