S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 0 | 0 |
2 | Work charge | 1 | 1500 | 1500 |
3 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-200 mm | 8 | 296.9 | 2375.2 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 2.3 | 3007.5 | 6917.25 |
5 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 1.45 | 226.8 | 328.86 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 1.95 | 4591.8 | 8954.01 |
7 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 146 | 48.2 | 7037.2 |
8 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 33.66 | 111.2 | 3742.992 |
9 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet. | 29.47 | 749.8 | 22096.606 |
10 | Providing and fixing cut stone slab (chisel dressed) for roofs including flush pointing of the bottom in C.M. 1:3 (1cement, 3sand) and filling the joints in C.M. 1:4 (1cement, 4sand) including fixing in chased grooves in walls, curing etc. complete. | 0.072 | 7999.4 | 575.9568 |
11 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti | 55 | 414.5 | 22797.5 |
12 | 1902 Transportion of metal | 1 | 14600 | 14600 |