State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: JAURIKOTWAL
Work Code: 1702001083/WC/22012035071638 (Dug pond nirman shitalwala jaurikotwal)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 22/5/2023
Present status : Non-existent Proposed Status : Constr of Earthen contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2023-2024/62566/TS Sanction Date : 24/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
684300.2 274275.73 29907.28 10389.48 0 0 0 315000 0 998872.69
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2023-2024/62566/AS Financial\Administrative Sanction Date 26/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:998873 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
999000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.10807.609314814814818218.06
2(III) Lead upto 200 meters1350126.363377777778170590.56
3(I) 1.50 m. to 3.00 m.117011.35718803418813287.91
4(II) 3.00 m to 4.50 m63019.8912530.7
5(b) C.C. 1:3:6 (1cement, 3sand, 6metal)63467.9883333333320807.93
6(e) In Cement mortar 1:6 (1cement, 6sand)253022.09475552.35
7(XXIX) 50 Km. Lead90937.69288888888984392.36
8(VI) 3.0 Km. Lead60151.31759079.05
9Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete.225187.29751111111142141.94
10Site clearance, cutting grass, raking into heaps and removing off the premises7203.053819444444442198.75
11a (i) Loose or soft soil for Road Work3510115.624988603989405843.71
12(b) Dense or hard soil (PT/45/45)27193.5655555555565226.27
1322cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum300444.2256133267.68
14Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.60212.270512736.23
Total Activity 996000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.2510001250
20084-Hire charges of Diesel truck - 9 tonne (without POL)15.03881965210031581.521265
30367-Portland Cement3.64375640023320
40982-Coarse sand (zone III)1.11625979.21093.032
50983-Fine sand (zone IV)11.6475102511938.6875
61157-Stone for masonry work2949514355
71158-Stone for pitching 15 cm x 22.5 cm9045040500
81235-Diesel oil359.6455909410035964.559094
93-Display Board / CIB130003000
105001-Mobil oil12.86195422703472.727634
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT5.443755002721.875
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)2.017901587.9
Total Material 171000