Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:22:53 AM 
Back  
State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: DHARMPURI
Work Code: 1724008022/WC/9993642839 (NISTAR TALAB NIRMAN KARAY THUSYA FALYA EST(7.07) D)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/1/2014 Work start date : 16/1/2014
Present status : Non-existent Proposed Status : Mini Percolation tank
Tech Sanction Details
Technical Sanction No. : 802/13-14 Sanction Date : 4/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
424200 282800 0 0 0 0 0 283000 0 707000
Financial Sanction Details
Financial\Administrative Sanction No: 401/13-17 Financial\Administrative Sanction Date 7/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:707000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
707000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil150.250.2
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work3513.1750.3176712.451
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work2606.9367.8176749.854
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work2454.8672176749.92
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work601.48292.4175872.752
Total Activity 707000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.000
2Blasting Holas000
3Cement(bori)32630097800
4Centring & Shuttering101.270.767160.912
5Compaction of Material104714.214867.4
6contergency000
7Transportanion of 40 MM metal59.64119.57126.98
8Transportanion of Bolder 172292.250258.4
9Transportanion of hard Muram670.672.8748866.622
10Transportanion of hart soil183.537.826939.97
11Transportanion of harting soil247183.245250.4
12Transportanion of Puddle earth000
13Transportanion of Sand85.7349.954282.2135
14Transportation charges of mate000
15Water supply (cum)111
16साईनबोर्ड 111
Total Material 283000