S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Damp proof course 4 cm thick of cement concrete 1:2:4 with water proofing compound as per manufacturer guide lines. | 2.02 | 229.905940594059 | 464.41 |
2 | Cement Concrete 1:8:16 with 40 mm Gauge stone aggregate | 7.64 | 2401.83376963351 | 18350.01 |
3 | First class burnt brick laid in cement sand mortar 1:5 in foundation and plinth | 83.53 | 4174.0681192386 | 348659.91 |
4 | 12.5 mm thick cement plaster 1:5. | 501.66 | 128.611150978751 | 64519.07 |
5 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing
of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (i) 1.5 meter vertical lift and 15 meter horizontal lead | 22.92 | 150.841623036649 | 3457.29 |
6 | Road Work. (3.1) Earth work in cutting including dressing, Dag belling to give level and camber including disposal of excavated soil to required lead.(i) 1.5 meter vertical lift and 15 meter horizontal lead (a) ordinary Earth. | 1044 | 124.42658045977 | 129901.35 |