Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 07:17:11 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KAMAI
Work Code: 1702001071/DP/22012034583855 (ब्रक्षारोपण कार्य - घाट बाले बाबा के पास कमई )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 30/7/2023
Present status : Not Exist Proposed Status : Boundary Line Plantation-Farm Forestry-Community
Tech Sanction Details
Technical Sanction No. : 1702001/2023-2024/113994/TS Sanction Date : 31/7/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
234328.52 191913.57 0 0 0 0 0 192000 0 426242.09
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2023-2024/113994/AS Financial\Administrative Sanction Date 31/7/2023
Fin. Sanc. Amt. (in Rs) NREGA:426242 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
427000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)721.1237580.91
2(a) Dense or hard soil (PT/60/60)43.2185.7990740740748026.52
3Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling)20013.37922675.84
4(I) Pit Size : 0.60 x 0.60 x 0.60 m, height less than 1.5 feet28018.55460714285715195.29
5Watering , Weeding (15 days interval), Hoeing, Training & Pruning (1 month interval), Mulching (only in summer season), Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, dewatering in case of water logging in rainy season, spraying insecticide/pesticide, putting required manure, fertilizer etc, complete supervision (in case of survival more than 80%) for first year (for road side/ canal/ सार्वजानिक plantation) Note: watering frequency to be increased during summer season.200233.2029546640.59
6Watering , Weeding (15 days interval), Hoeing, Training & Pruning (1 month interval), Mulching (only in summer season), Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, dewatering in case of water logging in rainy season, spraying insecticide/pesticide, putting required manure, fertilizer etc, complete supervision (in case of survival more than 80%) for second year (for roadside/ canal/ सार्वजानिक plantation) Note: watering frequency to be increased during summer season.200286.0060557201.21
7Watering , Weeding (15 days interval), Hoeing, Training & Pruning (1 month interval), Mulching (only in summer season), Stacking, Bunding, along sides (thala making), filling the soil in and around the plants, dewatering in case of water logging in rainy season, spraying insecticide/pesticide, putting required manure, fertilizer etc, complete supervision (in case of survival more than 80%) for Third/Fourth/Fifth year (for road side/ canal/ सार्वजानिक plantation)600286.00605171603.63
8Providing earthen pot , to be laid in the soil after planting.(labour component included in the activity of watering)80504000
9(VIII) 81 to 100 km2802.76271428571429773.56
10Providing Bucket/Can for carrying water for watering plants for community plantation57503750
11Maintenance of the bicycle of paudhrakshak55002500
12Supervision Charges for GP in Community Plantation and खेत की मेड पर वृक्षारोपण (individual plantation) Per Year5200010000
13Supervision Charges for Paudhrakshak for Road side/Canal side/ Community block/ Community compound Plantation Per Year(पर्यवेक्षण शुल्क पौधरक्षक, प्रतिवर्ष हेतु : सड़क किनारे/ नहर किनारे / सामुदायिक/ सार्वजनिक परिसर हेतु वृक्षारोपण )5200010000
14Providing and fixing bamboo tree guard with 12 rows of horizontal split bamboo tightened to bamboo poles 2m long, 1.7m above and 0.3m below ground level, 4 numbers in each tree guard. Average dia of bamboo pole shall be 8cm to 12cm. The spit bamboo used shall be 80cm in length having average dia 25mm and c/c spacing of split bamboo will be 13cm.280359.979857142857100794.36
Total Activity 424000
S.NoMaterialQuantityUnit PriceTotal
13-Display Board / CIB130003000
2MR11614-Earthen Pot (घड़ा)2805014000
3MR11615-Supervision charges for plantation (पर्यवेक्षण शुल्क वृक्षारोपण हेतु )4050020000
4MR11635-Hire charges for tractor with trolley (including all running expanses and POL)0.9128847.46773.561488
5MR11731-Bamboo Pole 8 to 12 cm dia22401533600
6MR11732-Bamboo 25mm avg dia53766.3634191.36
7MR6103-Urea505.92296
8MR6104-DAP (Diammonium phosphate)120293480
9MR6105-Single super phosphate (SSP) (Danedar)1006.35635
10MR6106-Muriate of potash12018.92268
11MR6107-Farm yard manure100001.212000
12MR6109-Chloropyrifos3040012000
13MR6111-Bucket103753750
14MR6112-Bicycle maintenance55002500
15MR6182-Forestry Plants for community plantation (height less than 1.5 feet)280123360
Total Material 146000