Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:27:56 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: KESUN
Work Code: 1725006028/WC/22012034956448 (नीर संचय नाला विस्तारीकरण राम सिंह शेर सिंह के खेत के पास)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2022 Work start date : 1/4/2022
Present status : Existing Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 1725006/2022-2023/88062/TS Sanction Date : 1/5/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
524115.19 180111.21 88.69 298.68 0 0 0 181000 0 704613.77
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2022-2023/88062/AS Financial\Administrative Sanction Date 1/5/2022
Fin. Sanc. Amt. (in Rs) NREGA:704901 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
705000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) 0.5 Km. Lead --189091.7115502645503173334.83
2Site clearance, cutting grass, raking into heaps and removing off the premises31502.818914285714298879.58
3c (iii) Hard moorum for Tank Work1890191.907899470899362705.93
4Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.18903.600179894179896804.34
5Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.189079.0971746031746149493.66
6Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )136823682
Total Activity 705000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.01787688515.82026
20084-Hire charges of Diesel truck - 9 tonne (without POL)45.365042242101708.41968
30367-Portland Cement0.07775125511428.4868632
40368-White cement 0.0003806157445.9921664
50983-Fine sand (zone IV)0.21554641076.25231.981813
61235-Diesel oil122.485608688329.021344
75001-Mobil oil4.536504182.9829.7265816
87900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
9MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
10MR6032-Snowcem/ durocem0.00072662778920.1914874
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
12MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver8.5057086021.54
Total Material 119000