State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: TEHRA
Work Code: 1713004025/WC/751 (सोकपिट निर्माण ts no. 751)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/4/2012 Work start date : 16/5/2012
Present status : Non-existent Proposed Status : Mini Percolation tank
Tech Sanction Details
Technical Sanction No. : 751/1 Sanction Date : 16/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
14000 9000 0 0 0 0 0 9000 0 23000
Financial Sanction Details
Financial\Administrative Sanction No: 56/1 Financial\Administrative Sanction Date 16/5/2012
Fin. Sanc. Amt. (in Rs) NREGA:23000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
23000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Work charge18.0266.521198.6904
2Extra for every additional lift of 1.5 m or part there of-Disintegrated/ soft or hard rock4.514.766.15
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.1282530.5323.904
4Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)2.3041759.54053.888
515mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand)18.2483.41521.216
6Deduct from item 1804 and 1805 above for metal breaking with Govt. boulders and excavated rock.10.8151.31634.04
7Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.8.01380.73049.407
8Transportation rates for Flag stone 20 to 40 mm thick8.01555.74451.157
9Transportation rates for Flag stone 40 to 50 mm thick26.164175.584593.87512
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work27.76873.82049.2784
Total Activity 23000
S.NoMaterialQuantityUnit PriceTotal
140 mm size HG metal10.81681814.4
2Brisks12103.84598
3Cement(bori)62501500
4contergency1400400
5Sand1670670
Total Material 9000