S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 18434 | 18434 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 600 | 0.2 | 120 |
3 | Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-40 mm thick | 210 | 239.2 | 50232 |
4 | Labour only for item no.1279 | 900 | 151.7 | 136530 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 144 | 191.16 | 27527.04 |
6 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 135 | 244.26 | 32975.1 |
7 | Loading of metal in truck, dumper etc. | 144 | 39.42 | 5676.48 |
8 | Unloading of metal in truck, dumper etc. | 135 | 50.37 | 6799.95 |
9 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 144 | 41 | 5904 |
10 | Collection of hard moorum including stacking at quarry. | 144 | 130.8 | 18835.2 |
11 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 1020 | 12.8 | 13056 |
12 | Collection of size stone for coursed rubble masonry rectangular in shape (maximum size 0.014cum to 0.06cum) including 20%headers.-Other than black trap Basalt or granite | 135 | 525.6 | 70956 |