S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3600 | 1.5 | 5400 |
3 | Contingency | 1 | 6000 | 6000 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 720 | 39.6 | 28512 |
5 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 540 | 32.4 | 17496 |
6 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2160 | 11.7 | 25272 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1000 | 115.26 | 115260 |
8 | Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact | 1080 | 26.2 | 28296 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 1440 | 73.4 | 105696 |
10 | Collection of soft moorum including stacking at quarry. | 540 | 102 | 55080 |