S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement Concrete 1:8:16 with brick
ballast 40mm gauge. | 24.85 | 2226.68893360161 | 55333.22 |
2 | Cement concrete 1:2:4 with stone ballast or shingle | 17.17 | 3702.68549796156 | 63575.11 |
3 | First class burnt brick laid in cement sand mortar 1:5 in foundation and plinth | 7.07 | 3913.1513437058 | 27665.98 |
4 | 12.5 mm thick cement plaster 1:4. | 266.81 | 134.45444323676 | 35873.79 |
5 | Steel work, fixed independently without
connecting plates, including cutting, hoisting and fixing in position :-
(C) Tees, angles and channels. | 0.5 | 6849.14 | 3424.57 |
6 | Other Works.(4.1)Earth work in excavation in foundation of building/Nalah upto 1.5 meter depth, including dressing of bottom and sides of trenches/watering, stacking the excavated soil, clear from the edge of excavation and subsequent earth filling around masonry, in 15cm. layer with compaction including disposal of all surplus soil, as directed with in a lead of 50 meter.(a) Ordinary Soil (i) 1.5meter vertical lift and 15 meter horizontal lead. | 7.61 | 181.890932982917 | 1384.19 |