S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 200 | 2.66 | 532 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 810 | 136.3 | 110403 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 89.62 | 298 | 26706.76 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 34.55 | 3829.11 | 132295.7505 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 65 | 3175.78 | 206425.7 |
6 | Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size. | 17.85 | 2331.15 | 41611.0275 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 144 | 172 | 24768 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 158.44 | 235 | 37233.4 |
9 | work charge | 1 | 25000 | 25000 |