S.No | Material | Quantity | Unit Price | Total |
1 | 3-Display Board / CIB | 1 | 4500 | 4500 |
2 | MR14001-Supply of insecticide chlorpyriphos . per pit | 25 | 377.6 | 9440 |
3 | MR14003-Supply of 38mm dia 1.50 mtr. Long bamboo sticks to support the plants to safe guard the tree from storm. | 500 | 94.5 | 47250 |
4 | MR14004-Supply of plants through contractor/nursery average rate for sapling above 6 feet height and 2.5 cm caliper size. | 500 | 130 | 65000 |
5 | MR14005-Tractor with tanker charges for watering the plants through tanker one tanker of 4000 ltrs. Water capacity is sufficient for 100 No plants. It will take 3 Hours. Item does not existed in csr 2020 | 2 | 0 | 0 |
6 | MR1791-Supplying of farm yard manure duly screened and stacked at site of work. | 60 | 295 | 17700 |
7 | MR1792-Loading /Unloading charges | 60 | 49.65 | 2979 |
8 | MR1793-Carriage of manure 5 km lead | 60 | 182.4 | 10944 |
9 | MR1794-Preliminary watering Charges 5 cm. layer over the surface .Rate for 100 liter = 0.45 | 200 | 0.45 | 90 |