S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3450 | 3 | 10350 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 675 | 260.4 | 175770 |
3 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 612 | 474.6 | 290455.2 |
4 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 3503.88 | 172.46 | 604279.1448 |
5 | Lossening of hard soil by ploughing the existing gound | 1305 | 52.7 | 68773.5 |
6 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 1167.96 | 183.16 | 213923.5536 |
7 | Field Technical Supervisior Charge-FTSC | 1 | 6448.602 | 6448.602 |