Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:04:20 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: MAKARLA
Work Code: 1725007078/RC/22012034181022 (पंच परमेश्‍वर सीसी रोड निर्माण कार्य हैण्‍डपंप से )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 8/8/2013
Present status : Gravel Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 161.. Sanction Date : 25/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost MMGSY scheme2 scheme3 Total
109000 72000 0 0 342000 0 0 414000 0 523000
Financial Sanction Details
Financial\Administrative Sanction No: 18.. Financial\Administrative Sanction Date 8/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:181000 MMGSY
342000
Scheme 2
0
Scheme 3
0
Total
523000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep5640.5282
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)125.973177.8400307.466
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used125.97118.614940.042
4False work for R.C.C. and P.C.C. work in plinth and foundation169.2154.226090.64
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)1886.31184.4
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 120.817.5906.075
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 114.7404588
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.127.97214.527449.565
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.97.86193.0518891.873
10Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7120.8123.62851.116
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work137.2381.211143.076
12Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)120.81118.614328.066
Total Activity 523000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL107.0765069595.5
2Cement776310240560
3Centering and Shuttering169.287.5514813.46
4contengency 212521225212
5Display board125002500
6Mason (semi skilled)243007200
7Mixer Machien1860010800
8murrom120.8175.499119.9469
9photocopy2002.5500
10Photograph1225300
11POLYTHENE (CUM)5183.51813
12SAND54.1745024376.5
13Vibrator184007200
Total Material 414000