S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 10.46 | 1000 | 10460 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.58 | 3089.9 | 1792.142 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.54 | 2404.1 | 3702.314 |
5 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 57.58 | 1043.6 | 60090.488 |
6 | Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth. | 93.42 | 172.3 | 16096.266 |
7 | TRANSPORTATION OF MATERIAL | 31 | 1000 | 31000 |
8 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 70.72 | 130.3 | 9214.816 |
9 | Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m. | 22.37 | 138.1 | 3089.297 |
10 | Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m. | 21.78 | 145.9 | 3177.702 |
11 | Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m. | 21.2 | 153.7 | 3258.44 |
12 | Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m. | 20.63 | 173 | 3568.99 |
13 | Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m. | 17.88 | 212 | 3790.56 |
14 | Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m. | 20.07 | 180.8 | 3628.656 |
15 | Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m. | 19.51 | 188.6 | 3679.586 |
16 | Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m. | 18.96 | 196.4 | 3723.744 |
17 | Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m. | 18.42 | 204.2 | 3761.364 |
18 | Earth work for well excavation-Hard moorum lift from 6.00 m. to 6.50 m. | 17.35 | 222.3 | 3856.905 |
19 | Earth work for well excavation-Hard moorum lift from 6.50 m. to 7.00 m. | 16.84 | 232.6 | 3916.984 |
20 | Earth work for well excavation-Hard moorum lift from 7.00 m. to 7.50 m. | 16.5 | 533.3 | 8799.45 |
21 | Earth work for well excavation-Hard moorum lift from 7.50 m. to 8.00 m. | 15.95 | 547.4 | 8731.03 |
22 | Earth work for well excavation-Hard moorum lift from 8.00 m. to 8.50 m. | 15.85 | 561.5 | 8899.775 |
23 | Earth work for well excavation-Hard moorum lift from 8.50 m. to 9.00 m. | 15.05 | 575.6 | 8662.78 |
24 | Earth work for well excavation-Hard moorum lift from 9.00 m. to 9.50 m. | 14.5 | 589.7 | 8550.65 |
25 | Earth work for well excavation-Hard moorum lift from 9.50 m. to 10.00 m. | 13.9 | 603.8 | 8392.82 |
26 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 1685 | 7.1 | 11963.5 |
27 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m | 389 | 12.9 | 5018.1 |
28 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 285 | 119.7 | 34114.5 |
29 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work | 126.9 | 81.2 | 10304.28 |
30 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 10.8 | 100.3 | 1083.24 |
31 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 9.5 | 139.1 | 1321.45 |