Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:28:21 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BADIYA GYASUR
Work Code: 1725006005/RC/22012034187675 (पंचपरमेश्‍वर सी0 क्रा0 सह नाली निर्माण कार्य विक्र)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 29/6/2013 Work start date : 25/9/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 187/2013 Sanction Date : 29/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
185000 123000 0 0 400000 0 0 523000 0 708000
Financial Sanction Details
Financial\Administrative Sanction No: 074/2013 Financial\Administrative Sanction Date 25/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:308000 Panchparmeshwar
400000
Scheme 2
0
Scheme 3
0
Total
708000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep682.50.5341.25
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)95.553296.4314971.02
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)79.632478.2197339.066
4False work for R.C.C. and P.C.C. work in plinth and foundation216.13154.233327.246
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)170.636.31074.969
6Collection of approved soil having CBR not less then 12, including stacking at quarry.196.608141.727859.3536
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 192.67.51444.5
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 95.55403822
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.263.24205.5154098.4524
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.192.6107.6420731.464
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work17097.716609
12work charge13600036000
Total Activity 708000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL74814.560273
240 M.M. METAL65764.549692.5
3CEMENT(BEGS)868305264740
4Centering and Shuttering196149.5329307.88
5CONTEN8360028800
6Display board125002500
7mason perday203507000
8Mixer Machien6023013800
9murrom174107.8418764.16
10photocopy312203660
11Photograph4720940
12SAND69569.7639313.44
13Thermocoal2010200
14Transpotation Charges401004000
Total Material 523000