S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1760.38 | 3 | 5281.14 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 610.12 | 260.4 | 158875.248 |
3 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 1795.37 | 13 | 23339.81 |
4 | Transportation of metal | 610.12 | 171.7 | 104757.604 |
5 | Transportation rates for Lime (fat), Hydraulic or any other. | 1434.28 | 116.91 | 167681.6748 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1964.77 | 16.9 | 33204.613 |
7 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 169.4 | 474 | 80295.6 |
8 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 553.37 | 574.6 | 317966.402 |
9 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work | 372.64 | 385.8 | 143764.512 |
10 | Lossening of hard soil by ploughing the existing gound | 308.54 | 2.7 | 833.058 |
11 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 308.54 | 50 | 15427 |
12 | Field Technical Supervisior Charge-FTSC | 1 | 21500 | 21500 |