State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: GOARKALAN
Work Code: 1702001025/RC/22012034230718 (Gravel Road Janjari pura To Goarkala)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 25/4/2014 Work start date : 29/9/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 7967 Sanction Date : 1/9/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1048000 450000 0 0 0 0 0 450000 0 1498000
Financial Sanction Details
Financial\Administrative Sanction No: 02/7967 Financial\Administrative Sanction Date 2/9/2014
Fin. Sanc. Amt. (in Rs) NREGA:1498000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1498000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.130504.153505
3Chain and compass survey.-Canals/Roads1.45584846.8
4Fly levelling for fixing temporary bench marks.-Above 15 m interval1.45438635.1
5Levelling - Headwork.-Below 5 m interval1.4514602117
6Levelling - Headwork.-Above 15 m interval1.45467677.15
7Stacking and boxing.-Moorum or sand8701513050
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1270000270000
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.87080.570035
10Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN87059.751939
11Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.153684.155261.5
12Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making347320.771891.1
13Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor433122.195715.1
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work665381.2540223.6
15Collection of hard moorum including stacking at quarry.870130.8113796
16contingency18200082000
17Labour difference in case of old SoR17346573465
Total Activity 1498000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work347320.771891.1
2Compaction of GSB87059.751939
3Compaction of Selected soil433122.195715.1
4contangency and work charges12500025000
5HumePipes15355053250
6Kilometre Stone (200 M)103343340
7Transportation of GSB1140000140000
8Transpotation Charges160006000
9बोर्ड120002000
Total Material 450000