Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:23:53 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/RC/22012034284575 (CC road pp nrega Bhagwansingh to chandarsingh dangeecha )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 11/9/2015
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 32/07/2015 Sanction Date : 31/8/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
62600 42000 0 0 194000 0 0 236000 0 298600
Financial Sanction Details
Financial\Administrative Sanction No: 32/07/2015 Financial\Administrative Sanction Date 10/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:104600 Panchparmeshwar
194000
Scheme 2
0
Scheme 3
0
Total
299000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)76.052648.1201388.005
2Labour only for item no. 0413 (for any proportion of cement concrete)76.05427.532511.375
3False work for R.C.C. and P.C.C. work in plinth and foundation90185.416686
4Transportation of metal 73.846.533433.914
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.66.92188.612621.112
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.34.22169.745808.5028
7Loading of metal in truck, dumper etc.73.828.622112.156
8Unloading of metal in truck, dumper etc.73.814.311056.078
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.73.844.73298.86
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work80.188.47080.84
11Collection of soft moorum including stacking at quarry.73.8122.89062.64
12contingency135403540
Total Activity 299000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL66.9280053536
220 mm metal transport000
340 mm Metal000
4CEMENT.471270127170
5Centering and Shuttering90122.110989
6contengency119001900
7sand cum34.2260020532
8Transportaion of muram (trip)73.846.533433.914
9Transportation of sand34.22169.745808.5028
10transpotation of matel66.92188.612621.112
Total Material 236000