State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: TINDUWA
Work Code: 1711003045/WC/22012034330317 (STOP DAM NIRMAN KETHORA GHAT TINDUA NALA PAR)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2017 Work start date : 10/6/2017
Present status : Non-existent Proposed Status : Stop Dam
Tech Sanction Details
Technical Sanction No. : 163/025/715 Sanction Date : 8/6/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
821000 540000 0 0 0 0 0 540000 0 1361000
Financial Sanction Details
Financial\Administrative Sanction No: 05/tin Financial\Administrative Sanction Date 9/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:1361000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1361000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency14535045350
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)19.83474.168787.18
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)50.72603.5131997.45
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:5 (1cement, 5sand)367.972343.7862411.289
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height14000040000
7TRANSPORTATION OF MATERIAL1119419119419
8Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing176.489.915858.36
922cm thick grouted stone pitching (without quarry spalls) with individual stones of 22cm depth in minimum size 0.014cum grouting in cement mortar 1:696657.763139.2
10Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed227.752.711999.79
Total Activity 1361000
S.NoMaterialQuantityUnit PriceTotal
140 MMmatal74.3180059448
2Cement672300201600
3FTSC-Field Technical supervisi12722027220
4Gate Plate and Angle8005040000
5Masonry Stone227.7333.0675837.762
6PhotoCopy & Stationary120002000
7pitching stone52.82333.0617592.2292
8signboard120002000
9गिटटी 20 एम एम41.78120050136
10रेत64100064000
Total Material 540000