S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc.
complete. | 0.336 | 1220.92261904762 | 410.23 |
2 | Excavation in earth for all sorts of soil & silt, lime, shadu, sand/ grit, such types of strata including dressing and conveying the excavated material by head and upto a distance of 10m and laying or spreading or filling in furrahas in layers of 30cm thick upto lift of 1:50m as directed. (A) Excavation - (In General) Rate for the area | 1.176 | 116.028911564626 | 136.45 |
3 | Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC without SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand | 0.336 | 4201.90476190476 | 1411.84 |
4 | Providing and laying in situ, cement concrete in M-15 of trap / granite / quartzite / gneiss metal for bed blocks, foundation blocks and
such other items including bailing out water formwork, compacting, roughening them if special fiih is to be provided and curing and
finishing if required complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drm Type mixer...
With Natural Sand | 1.052 | 4695.92205323194 | 4940.11 |
5 | Man days for unskilled | 423.045 | 273.000011819074 | 115491.29 |
6 | Lum sum Material for all works. | 29758.05 | 1 | 29758.05 |
7 | Providing and fixing in position TMT FE 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete. a) For TMT Fe 500 steel bars | 0.084 | 71024.7619047619 | 5966.08 |