State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SIGON
Work Code: 1711003/WC/22012035068655 (Const. of Stopdam Aasharam Ke Khet K pass Gram Muhli)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 2/4/2023 Work start date : 16/5/2023
Present status : Non-existent Proposed Status : Constr of Masonry/CC Anicut for Community
Tech Sanction Details
Technical Sanction No. : 111/23 Sanction Date : 27/4/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
951000 2218000 0 0 0 0 0 2218000 0 3169000
Financial Sanction Details
Financial\Administrative Sanction No: 1324/22 Financial\Administrative Sanction Date 10/5/2023
Fin. Sanc. Amt. (in Rs) NREGA:3169000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
3169000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency1111180111180
2Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)145363.8652759.7
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)206.413467.99715827.8159
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)53.623077.97165040.7514
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)248.155689.661411889.129
6False work for R.C.C. and P.C.C. work in plinth and foundation499.6191.295523.52
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars93584.4578960.75
8Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.1320163320163
9Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Good local sand free from earth.116.271329.9154627.473
10Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti271.67230.162511.267
Total Activity 3169000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL124.541030128276.2
240 M.M. METAL154.34950146623
3CEMENT (BEGS)2945320942400
4Contangancy12200022000
5False Work424138.5158728.24
6mooram208.79406.7184916.9809
7SAND (RATE)215.562250485010
8sign board150005000
9steel325102.733377.5
10steel work87879.2769599.06
11Transporation of Sand215.56585.71126255.6476
12Transportation of metal278.88414.75115665.48
Total Material 2218000