The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 05:53:46 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BHAGWANPURA
Work Code: 1725001005/IF/1000019039 (कपिल धारा प्रेमसिंह पिता लक्ष्‍मण भुरलाय )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/5/2013 Work start date : 1/6/2013
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 26.00 Sanction Date : 24/5/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
144000 96000 0 0 0 0 0 96000 0 240000
Financial Sanction Details
Financial\Administrative Sanction No: 00.3 Financial\Administrative Sanction Date 1/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:240000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
240000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil268.1950.213463.138
2Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)571830.211436.6
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6321.93079.797
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.33341821635.94
5False work for R.C.C. and P.C.C. work in plinth and foundation127154.219583.4
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars17865.911730.2
7Stacking and boxing.-Moorum or sand4.51567.5
8Transportation of metal 4.5145.35654.075
9Transportation of metal 5.38161.5868.87
10Transportation of metal 1.39145.35202.0365
11Transportation of metal 7.72145.351122.102
12Transportation of metal 0.18145.3526.163
13FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size4.5150.4676.8
14FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.5263.13551.85
15Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil27.1790.12448.017
16Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum27.17117.13181.607
17Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)54.34278.4115128.7994
18Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.202.7513.95104177.665
19Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)1510510
20Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work166.4890.114999.848
21work charge11143111431
Total Activity 240000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL69505700
2Blasting (No)25010025000
3Cement(bori)4630013800
4Centering and Shuttering100757500
5CONTANGANCY118001800
6deasil pump2065013000
7Display board120002000
8MASON (PERDAY)123504200
9P V C PIPE 233501050
10PhotoCopy & Stationary110001000
11Recharge pit LS135003500
12Sand412004800
13STEEL190458550
14Transpotation Charges141004100
Total Material 96000