S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 314.06 | 55.6 | 17461.736 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum | 471.24 | 66.9 | 31525.956 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 785.4 | 155.5 | 122129.7 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 30.8 | 99.6 | 3067.68 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 15.17 | 2296.4 | 34836.388 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 16.76 | 1762.4 | 29537.824 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 15.17 | 61.3 | 929.921 |
8 | Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size. | 56.04 | 1298.5 | 72767.94 |
9 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 230.61 | 151.3 | 34891.293 |
10 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 31.3 | 266.42 | 8338.946 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 100.43 | 225.27 | 22623.8661 |
12 | Transportation rates for Hume pipes (NP-3) 800 mm to 900 mm dia. | 12 | 446.81 | 5361.72 |
13 | Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia. | 12 | 1930.9 | 23170.8 |
14 | 1902 Transportion of metal | 149.2 | 190.3 | 28392.76 |
15 | work charge | 1 | 58962 | 58962 |
16 | Fixing of Information board with diging pits and grout in cement concret mixture (1:2:4). Mandays per board | 1 | 2000 | 2000 |