S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 8888.75 | 6.64 | 59021.3 |
2 | Work charge | 100 | 8760 | 876000 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 443.75 | 139 | 61681.25 |
4 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 766.34 | 181.56 | 139136.6904 |
5 | Dag-beling-Single spade stroke minimum 75mm deep | 455 | 0.38 | 172.9 |
6 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1961 | 17.37 | 34062.57 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 37.81 | 3829.11 | 144778.6491 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 5.9 | 3175.78 | 18737.102 |
9 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 13132.87 | 2.38 | 31256.2306 |
10 | Transportation of metal | 439.9 | 111.75 | 49158.825 |
11 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 75.53 | 242.27 | 18298.6531 |
12 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 6692.97 | 21.79 | 145839.8163 |
13 | SIGN BOARD | 1 | 4000 | 4000 |