Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:41:55 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/WC/22012034396931 (Check Dam Nirman Masudpur Walo ke Pas nariya me)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 5/9/2018
Present status : Non-existent Proposed Status : Repair & Maint of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 21/410 Sanction Date : 25/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
314000 1143000 0 0 0 0 0 1143000 0 1457000
Financial Sanction Details
Financial\Administrative Sanction No: 4021/19 Financial\Administrative Sanction Date 30/8/2018
Fin. Sanc. Amt. (in Rs) NREGA:1457000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1457000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.10504.44620
2Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Dense or hard soil105066300
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)78.562504196714.24
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used251.3413307.4831285.2234
5False work for R.C.C. and P.C.C. work in plinth and foundation374.13147.855296.414
6Transportation of metal 55.295451.724976.7515
7Transportation of metal 70.7451.731935.19
8Transportation of sand143.42348.9350043.5406
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.67.393177.9311991.23649
10SIGN BOARD1104000104000
11Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed1861.6252.798107.374
12contingency141730.0300141730.03001
Total Activity 1457000
S.NoMaterialQuantityUnit PriceTotal
110 M.M. STEEL10059.15910
220 M.M. METAL55.295130071883.5
340 mm size HG metal70.7105074235
4Cement1800300540000
5Centring & Shuttering1115112115112
6Display board140004000
7HIRE CHARGE OF VIABRATOR2080016000
8Hire Charge Mixture Machine3080024000
9hume pipe6353821228
10Loosening Machine Rent1861.622.75026.374
11Rolling 0012080016000
12Transpotation Charges500123.0361515
13Water Supply3080024000
14गिटटी परिवहन200123.0724614
15मिटटी परिवहन200123.724740
16रेत143.42800114736
Total Material 1143000