State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/RC/22012034178630 (cc road shobharam ke ghar se jasram ghar or )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 14/4/2013 Work start date : 17/8/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 0021 Sanction Date : 31/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
103200 68800 0 0 328000 0 0 397000 0 500000
Financial Sanction Details
Financial\Administrative Sanction No: 001/21 Financial\Administrative Sanction Date 5/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:172000 Panchparmeshwar
328000
Scheme 2
0
Scheme 3
0
Total
500000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard147004700
2Dag-beling-Double spade "v" shaped stroke 100mm deep5640.4225.6
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.95.642456.443651.0088
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)103.1222843.3293206.7826
5False work for R.C.C. and P.C.C. work in plinth and foundation162.696121.819816.3728
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)334.6462007.84
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 95.6425.2497.3384
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 103.12229.23011.1624
9Transportation of metal 87.662560.549134.551
10Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.14432544325
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work114.34273.48392.7028
12contingency12110221102
13Labour difference in case of old SoR193389338
Total Activity 500000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT.275250.1868799.5
2complite materail punch parmes1328000328000
Total Material 397000