S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 10623 | 10623 |
3 | Work charge | 120 | 100 | 12000 |
4 | Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm | 0 | 0 | 0 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 300 | 2214.6 | 664380 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 158.95 | 75.5 | 12000.725 |
7 | Transportation rates for Masonry stone. | 432 | 333.06 | 143881.92 |
8 | Loading of metal in truck, dumper etc. | 432 | 44.1 | 19051.2 |
9 | Site clearance, cutting grass, raking into heaps and removing off the premises | 400 | 1.8 | 720 |
10 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 862.86 | 97.6 | 84215.136 |
11 | Collection of soft moorum including stacking at quarry. | 2359 | 229.2 | 540682.8 |