Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:35:41 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KACHPURA
Work Code: 1702001003/RC/22012034310307 (Cc road Hajuri house to shiyaram house)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2016 Work start date : 5/4/2016
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 07/04 Sanction Date : 2/4/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
85800 57200 0 0 300000 0 0 358000 0 443000
Financial Sanction Details
Financial\Administrative Sanction No: 04/07 Financial\Administrative Sanction Date 4/4/2016
Fin. Sanc. Amt. (in Rs) NREGA:143000 Panchparmeshwar
300000
Scheme 2
0
Scheme 3
0
Total
443000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep3750.5187.5
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.78.2537.342016.86
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)82.963067.2254454.912
5False work for R.C.C. and P.C.C. work in plinth and foundation15312919737
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2256.21395
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 78.26.4500.48
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 87.9634.43025.824
9Transportation of 20 MM metal68.27836.957135.163
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.14700047000
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.96.687.38433.18
12contingency162006200
Total Activity 443000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)15720057200
2complite materail punch parmes1300000300000
Total Material 358000