Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:33:05 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: PALAYCHHA(P)
Work Code: 1703004041/IF/22012034522680 (WATER HARVESTING P.M. AAWAS SHYAMBABU/SUKHLAL)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2019 Work start date : 2/1/2020
Present status : Not Exist Proposed Status : Construction of Soak Pit for Individual
Tech Sanction Details
Technical Sanction No. : 613/041 Sanction Date : 20/11/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1565 4435 0 0 0 0 0 4500 0 6000
Financial Sanction Details
Financial\Administrative Sanction No: 26/41 Financial\Administrative Sanction Date 25/11/2019
Fin. Sanc. Amt. (in Rs) NREGA:6000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
6000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 250 cm and not exceeding 300 cm000
2Labour only for cement lime mortar11378.081378.08
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil3.1776.9243.773
4Labour only for.-For item no. 131111.952853405.75
5Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm)0.79160.5126.795
6Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size1.81375678.75
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.0.79211.2166.848
Total Activity 6000
S.NoMaterialQuantityUnit PriceTotal
1boldar1288.15288.15
2Bricks504200
3CEMENT (Beg)1300300
4Display board1200200
5Plant540200
6PVC Pipe65003000
7Sand0.180080
8Transpotation Charges0.79211.2166.848
Total Material 4500