S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 250 cm and not exceeding 300 cm | 0 | 0 | 0 |
2 | Labour only for cement lime mortar | 1 | 1378.08 | 1378.08 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 3.17 | 76.9 | 243.773 |
4 | Labour only for.-For item no. 1311 | 11.95 | 285 | 3405.75 |
5 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm) | 0.79 | 160.5 | 126.795 |
6 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 1.81 | 375 | 678.75 |
7 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 0.79 | 211.2 | 166.848 |