S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2 | 1000 | 2000 |
2 | Labour only for item no.0402 | 198.3 | 190.67 | 37809.861 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 87.34 | 434 | 37905.56 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 76.4 | 564 | 43089.6 |
5 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 2 | 13000 | 26000 |
6 | Transportation of metal | 435 | 76.8 | 33408 |
7 | Transportation of metal | 876 | 35.6 | 31185.6 |
8 | Transportation of metal | 14.3 | 2208 | 31574.4 |
9 | Transportation of metal | 87.6 | 324 | 28382.4 |
10 | Site clearance, cutting grass, raking into heaps and removing off the premises | 86.3 | 435 | 37540.5 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 25.54 | 876.6 | 22388.364 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work | 2 | 24567 | 49134 |