Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:12:01 AM 
Back  
State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: BARHA BADA
Work Code: 1734004056/RC/22012034544655 (सी सी रोड एवं नाली निर्माण रज्जू गडरिया से शालक गडरिया की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/6/2020 Work start date : 15/10/2020
Present status : Earthern road Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 1054 20-21 Sanction Date : 12/6/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 14th Fianance Commission scheme2 scheme3 Total
101000 0 0 0 280000 0 0 280000 0 381000
Financial Sanction Details
Financial\Administrative Sanction No: 80 20-21 Financial\Administrative Sanction Date 14/6/2020
Fin. Sanc. Amt. (in Rs) NREGA:101000 14th Fianance Commission
280000
Scheme 2
0
Scheme 3
0
Total
381000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.210002000
2Labour only for item no.0402198.3190.6737809.861
3Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.87.3443437905.56
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)76.456443089.6
515mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand)21300026000
6Transportation of metal 43576.833408
7Transportation of metal 87635.631185.6
8Transportation of metal 14.3220831574.4
9Transportation of metal 87.632428382.4
10Site clearance, cutting grass, raking into heaps and removing off the premises86.343537540.5
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work25.54876.622388.364
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work22456749134
Total Activity 381000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL31450043500
240 M.M. Gitti21350027000
3BAJARA12180021600
4cement bag14534049300
5Centring & Shuttering5467641496
6contangency and work charges23423454756
7Mixture Machine89007200
8send12190022800
9Transpotation Charges714009800
10साईनबोर्ड 120002000
Total Material 280000