S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 4000 | 4000 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil | 109 | 193.57 | 21099.13 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 41 | 4.38 | 179.58 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 52.75 | 4408.25 | 232535.1875 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 438 | 191.9 | 84052.2 |
6 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 30.3 | 1444.41 | 43765.623 |