S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 23.33 | 35.8 | 835.214 |
3 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 61 | 504.8 | 30792.8 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 92.67 | 2928.1 | 271347.027 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 37.5 | 2199.9 | 82496.25 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 168 | 127.3 | 21386.4 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 52.33 | 6 | 313.98 |
8 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 69.77 | 32 | 2232.64 |
9 | Transportation of 20 MM metal | 110 | 659.2 | 72512 |
10 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 33000 | 33000 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 52.33 | 81.2 | 4249.196 |
12 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 58.32 | 88.3 | 5149.656 |
13 | contingency | 1 | 22749 | 22749 |
14 | Labour difference in case of old SoR | 1 | 7450 | 7450 |