Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:57:25 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: BIRGANVANRANI
Work Code: 1702001032/RC/22012034227174 (C.c.road Punchayat Office Se Hanuman Mandir Ki or)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 27/5/2014 Work start date : 13/8/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 111/14-15 Sanction Date : 8/8/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
110400 73600 0 0 374000 0 0 448000 0 558000
Financial Sanction Details
Financial\Administrative Sanction No: 06/111/14-15 Financial\Administrative Sanction Date 10/8/2014
Fin. Sanc. Amt. (in Rs) NREGA:184000 Panchparmeshwar
374000
Scheme 2
0
Scheme 3
0
Total
558000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m23.3335.8835.214
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.61504.830792.8
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)92.672928.1271347.027
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)37.52199.982496.25
6False work for R.C.C. and P.C.C. work in plinth and foundation168127.321386.4
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 52.336313.98
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 69.77322232.64
9Transportation of 20 MM metal110659.272512
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.13300033000
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work52.3381.24249.196
12Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil58.3288.35149.656
13contingency12274922749
14Labour difference in case of old SoR174507450
Total Activity 558000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)262.85728073599.96
2Convergence Amount1374000374000
Total Material 448000