State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: MANGOLA
Work Code: 1711003017/WC/22012034387739 (NAVEEN TALAB NIRMAN RUSALYA MUHALL KABEERPUR)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2018 Work start date : 15/3/2018
Present status : Non-existent Proposed Status : Earthen Dam
Tech Sanction Details
Technical Sanction No. : 1358/man Sanction Date : 9/3/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
880000 559000 0 0 0 0 0 559000 0 1439000
Financial Sanction Details
Financial\Administrative Sanction No: 01/mgn Financial\Administrative Sanction Date 14/3/2018
Fin. Sanc. Amt. (in Rs) NREGA:1439000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1439000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.2378.011.84280.418
3Contingency15497254972
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil7782.7352.7410149.871
5Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil72.3552.73812.845
6Dag-beling-Single spade stroke minimum 75mm deep396.330.3118.899
7Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead1556.5423.937201.306
8Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m11.8939463.71
9Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.653474.116154.565
10Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)8.182603.521296.63
11Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:5 (1cement, 5sand)71.42343.7167340.18
12TRANSPORTATION OF MATERIAL1154694154694
13Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing52.5189.94720.649
1422cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.0141432.15212.1303759.015
15Snowcem or durocem painting of any shade-2 coats on new work000
16Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 421.352.2926.97
17Transportation of sand91.96133.8312307.0068
18Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.421.35133.8356389.2705
19Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.91.9644.74110.612
20FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc.722.22165.4119455.188
21Collection of puddle earth including stacking at quarry421.35122.851741.78
22Collection of hard moorum including stacking at quarry.91.96142.513104.3
Total Activity 1439000
S.NoMaterialQuantityUnit PriceTotal
1Cement25230075600
2FTSC-Field Technical supervisi12878028780
3Messonary Stone287.97333.0695911.2882
4PhotoCopy & Stationary118811881
5pitching stone460.04333.06153220.9224
6Soil Transportation572.8133.8376657.824
7Transportation Of muram117.96214.1125256.4156
8Water Transportation12000020000
9गिटटी 20 एम एम16.41120019692
10बोर्ड120002000
11रेत60100060000
Total Material 559000