State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BHAGWANPURA
Work Code: 1725001005/IF/22012034419712 (इमरता बाई / श्रीचंद खेत तालाब भगवानपूरा )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 15/6/2018
Present status : Not Exist Proposed Status : Construction of Farm Ponds for Individuals
Tech Sanction Details
Technical Sanction No. : 05/87/2018 Sanction Date : 1/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
100000 30000 0 0 0 0 0 30000 0 130000
Financial Sanction Details
Financial\Administrative Sanction No: 05/01/2018 Financial\Administrative Sanction Date 15/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:130000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
130000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Mud Mortar110001000
222cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014115.4260.430050.16
3Labour only-For item no.1321580.910.76215.63
4Surface dressing two coats with paving bitumen using 18kg. of bitumen 80/100 per 10sqm with 0.15cum of stone chipping 13.2mm nominal size per 10sqm for 1st coat and 11kg. of bitumen 80/100 per 10sqm with 0.10cum of stone chipping 11.2mm nominal size per 151364.73756823.6875
5Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.16005080000
6Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum20152.75440.5
Total Activity 130000
S.NoMaterialQuantityUnit PriceTotal
1FTSC-Field Technical supervisi6522514625
2Plants108008000
3TRAINSPORT CHARGE651107150
4Transportation charges1200200
Total Material 30000