S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Mud Mortar | 1 | 1000 | 1000 |
2 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 115.4 | 260.4 | 30050.16 |
3 | Labour only-For item no.1321 | 580.9 | 10.7 | 6215.63 |
4 | Surface dressing two coats with paving bitumen using 18kg. of bitumen 80/100 per 10sqm with 0.15cum of stone chipping 13.2mm nominal size per 10sqm for 1st coat and 11kg. of bitumen 80/100 per 10sqm with 0.10cum of stone chipping 11.2mm nominal size per 1 | 5 | 1364.7375 | 6823.6875 |
5 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 1600 | 50 | 80000 |
6 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 2015 | 2.7 | 5440.5 |