S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0.38 | 650 | 247 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 6.5 | 665 | 4322.5 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 182.81 | 148.33 | 27116.2073 |
4 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Loose or soft soil | 1374.65 | 36.56 | 50257.204 |
5 | Extra for under-ramming inside the bore holes for under reamed piles.-200mm | 975 | 109.18 | 106450.5 |
6 | Extra for under-ramming inside the bore holes for under reamed piles.-300mm | 302.25 | 2363.84 | 714470.64 |
7 | Add to or deduct from the rate for bore holes of 3.5metre depths, if the bore-holes are made deeper or shallower than 3.5metres.-250mm | 720 | 144.08 | 103737.6 |
8 | Extra rate for laying stone work in or under water and or liquid mud including cost of pumping or bailing out water and removing slush etc, complete etc.(For every 0.3 meter depth) | 37.35 | 3920.69 | 146437.7715 |
9 | Providing and fixing 25mm thick single leaf battened and framed door shutter including bright finished or/and black enamelled M.S. butt hinges with necessary screws.-Sal wood | 150 | 86.69 | 13003.5 |
10 | contingency | 81000 | 1 | 81000 |