S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1000 | 7.60932 | 7609.32 |
2 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 632 | 316.795506329114 | 200214.76 |
3 | (VI) 3.0 Km. Lead | 632 | 174.015189873418 | 109977.6 |
4 | (c) Hard moorum for Tank Work, lift of up to 3m depth | 1200 | 183.9825 | 220779 |
5 | b (iii) Dense or hard soil for Tank Work | 320 | 156.08125 | 49946 |
6 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 720 | 3.051 | 2196.72 |