Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:19:55 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BIHAR
Work Code: 1725007015/RC/22012034185643 (पंच परमेश्‍वर सीसीरोड निर्माण कार्य सबल्‍या नंदन क)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 24/6/2013 Work start date : 28/6/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 152xx Sanction Date : 25/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
127000 85000 0 0 400000 0 0 485000 0 612000
Financial Sanction Details
Financial\Administrative Sanction No: 13xx Financial\Administrative Sanction Date 26/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:212000 Panchparmeshwar
400000
Scheme 2
0
Scheme 3
0
Total
612000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep6600.5330
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)137.23177.8435994.16
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used137.2118.616271.92
4False work for R.C.C. and P.C.C. work in plinth and foundation198154.230531.6
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2206.31386
6Collection of approved soil having CBR not less then 12, including stacking at quarry.160.5118.819067.4
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 160.57.51203.75
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 137.2405488
9Transportation of metal 116.62214.525014.99
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.249.68164.5841092.3344
11Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7160.523.63787.8
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.172.4981.214006.188
13work charge117825.2217825.22
Total Activity 612000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL116.621000116620
2CEMENT(BEGS)860300258000
3Centering and Shuttering198100.1419827.72
4contengency16103.046103.04
5Display board110001000
6mason perday123003600
7mixer machin (perday)126007200
8Photo copy35270
9Photograph425100
10POLYTHENE (CUM)66031980
11SAND5985050150
12Transportanion of hard Muram160.596.8815549.24
13Vibrator (Per Day)124004800
Total Material 485000