State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: KATAHA
Work Code: 1713004058/RC/22012034201466 (khet sadak Ramakant shukla ke ghar se ghopi taraf )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 29/1/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1653/58 Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
606000 405000 0 0 135000 0 0 540000 0 1146000
Financial Sanction Details
Financial\Administrative Sanction No: 103/58 Financial\Administrative Sanction Date 12/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:1011000 Panchparmeshwar
135000
Scheme 2
0
Scheme 3
0
Total
1146000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises51201.68192
2Dag-beling-Single spade stroke minimum 75mm deep24000.2480
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)28.6063007.586032.545
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)5.4972343.812883.8686
5False work for R.C.C. and P.C.C. work in plinth and foundation82.506126.210412.2572
6TRANSPORTATION OF MATERIAL13255532555
7Transportation of metal 2568.82102.69263792.1258
8Transportation of metal 262.59223.5658704.6204
9Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia20964.419288
10Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.53868.119340.5
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1470.8421.531623.06
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1367.842331460.32
13Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)465.5639.618436.176
14Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:132.6578.376682.58
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work735.4281.259716.104
16Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti30.95797.63021.4032
17Collection of puddle earth including stacking at quarry2198.02112.8247936.656
18Collection of hard moorum including stacking at quarry.370.8130.848500.64
19SIGN BOARD129812981
20DAG BELING1.39348.2483.998
21work charge50014673000
22contingency14000040000
Total Activity 1146000
S.NoMaterialQuantityUnit PriceTotal
12049-Construction of gravel su123.6391.4848386.928
2BGSY Information Board in Ceme150585058
3BGSY SIGN BOARD125432543
4Centering and Shuttering82.50675.76245.7042
5Compaction of Earth Work1470.8416.824710.112
6Compaction of GSB465.562310707.88
7Compaction of Selected soil1367.819.827082.44
8contigency13299432994
9Kilometre Stone (200 M)4188752
10Kilometre Stone (ordinary)28431686
11pf RCC hume pipe 100053868.119340.5
12pipe20905.918118
13Transportanion of hard Muram465.56184.1485728.2184
14Transportation Of Selected Soi2103.2663.27133073.2602
15सम्‍पूर्ण सामाग्री क्रर्य1123248123248
Total Material 540000