Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/11/2015 Work start date : 25/1/2016
Present status : Not Exist Proposed Status : DUGWELLS
Tech Sanction Details
Technical Sanction No. : ts/438 Sanction Date : 13/12/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
219000 71000 0 0 0 0 0 71000 0 290000
Financial Sanction Details
Financial\Administrative Sanction No: as/7/39 Financial\Administrative Sanction Date 15/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:290000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
290000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11100011000
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m124.0135.84439.558
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.542404.13702.314
5Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.651043.667834
6Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)5200510025
7TRANSPORTATION OF MATERIAL20100020000
8Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m.21.2151.53211.8
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work100119.711970
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work160130.220832
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work150353.252980
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work170477.281124
Total Activity 290000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL0.5850425
240 M.M. METAL0.5450225
3Balsting Work5100500
4Brick50031500
5Cement(bori)253107750
6Contagecny1600600
7deasil pump75003500
8Display board120002000
9Masonry Stone8552044200
10P V C PIPE 21500500
11Photocopy & staionary1503450
12Photograph450200
13Sand1.57501125
14Transpotation Charges170007000
15फरसी42501000
Total Material 71000