State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BHAGWANPURA
Work Code: 1725001005/RC/22012034179430 (सी सी रोड निर्माण्‍ा कार्य लक्ष्‍मण के घर से अभयसि)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2013 Work start date : 1/8/2013
Present status : Earthern road Proposed Status : Cement concrete
Tech Sanction Details
Technical Sanction No. : 0308/13 Sanction Date : 5/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
85000 57000 0 0 211000 0 0 268000 0 353000
Financial Sanction Details
Financial\Administrative Sanction No: 014/13 Financial\Administrative Sanction Date 10/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:142000 Panchparmeshwar
211000
Scheme 2
0
Scheme 3
0
Total
353000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Mud Mortar1233.1233.1
2Dag-beling-Single spade stroke minimum 75mm deep2700.5135
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)73.583478.5255948.03
4False work for R.C.C. and P.C.C. work in plinth and foundation201.78154.231114.476
5Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2646.31663.2
6Collection of approved soil having CBR not less than 5, including stacking at quarry.57.831267286.58
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 57.836346.98
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 73.58322354.56
9Transportation of metal 16.19193.053125.4795
10Transportation of metal 62.54214.513414.83
11Transportation of metal 31.64193.056108.102
12Transportation of metal 57.83107.646224.8212
13Site clearance, cutting grass, raking into heaps and removing off the premises55.0897.75381.316
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work194.4797.718999.719
Total Activity 353000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL5875043500
2CEMENT(BEGS)460295135700
3Centering and Shuttering160609600
4Display board120002000
5mixer machin (perday)126007200
6murrom5818010440
7PhotoCopy & Stationary1560560
8SAND34130044200
9Transportation charges130003000
10Vibrator (Per Day)221002200
11Water With Tenkar166009600
Total Material 268000