S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 25457 | 25457 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 400 | 0.2 | 80 |
3 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 780 | 0.5 | 390 |
4 | Labour only for item no.1279 | 936 | 151.7 | 141991.2 |
5 | Dismantling tiled floors laid in mortar upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead. (wooden\ concrete joists to be measured and paid for separately)-For thickness of tiles above 25 mm | 1300 | 12.8 | 16640 |
6 | Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite. | 140.4 | 475.3 | 66732.12 |
7 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 140.4 | 27.1 | 3804.84 |
8 | Transportation of metal | 297.96 | 228.96 | 68220.9216 |
9 | Transportation of metal | 140.4 | 539.84 | 75793.536 |
10 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 241.8 | 41 | 9913.8 |
11 | Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia | 15 | 723.1 | 10846.5 |
12 | Laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia | 6 | 58.9 | 353.4 |
13 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 152 | 81.2 | 12342.4 |
14 | Collection of hard moorum including stacking at quarry. | 297.96 | 130.8 | 38973.168 |