S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2000 | 4.4 | 8800 |
2 | Contingency | 1 | 47884 | 47884 |
3 | Work charge | 1 | 4375.69 | 4375.69 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 266.625 | 3307.4 | 881835.525 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 32.76 | 2504 | 82031.04 |
6 | Plum cement concrete 1:3:6 with 75% graded metal of 40mm size and 25% plums of 150mm size. | 9 | 1821.2 | 16390.8 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 478.56 | 147.8 | 70731.168 |
8 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 20 | 198 | 3960 |
9 | Transportation of 20 MM metal | 226.63 | 596.7 | 135230.121 |
10 | Transportation of sand | 131.94 | 259.83 | 34281.9702 |
11 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 34.58 | 253.7 | 8772.946 |
12 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 21.65 | 355.18 | 7689.647 |
13 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 234.63 | 97.03 | 22766.1489 |
14 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 68.5 | 44.7 | 3061.95 |
15 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 930.24 | 96.2 | 89489.088 |
16 | Collection of hard moorum including stacking at quarry. | 68.5 | 185.4 | 12699.9 |