State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: POLAYKHURDA
Work Code: 1719006071/RC/22012034202547 (cc road pp nrega shankar to gopilal polay khurd)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 22/8/2013 Work start date : 4/2/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 71/02 Sanction Date : 30/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
95000 61700 0 0 295600 0 0 358000 0 452300
Financial Sanction Details
Financial\Administrative Sanction No: 71/02 Financial\Administrative Sanction Date 31/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:156700 Panchparmeshwar
295600
Scheme 2
0
Scheme 3
0
Total
453000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)115.22442.8281410.56
2Labour only for item no. 0413 (for any proportion of cement concrete)115.2392.245181.44
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used115.2132.115217.92
4False work for R.C.C. and P.C.C. work in plinth and foundation144153.122046.4
5Deduct for concrete unvibrated in item no. 0425115.215617971.2
6Transportation of metal 127.840.145129.892
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.101.36166.416866.304
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.77.17149.7611556.9792
9Loading of metal in truck, dumper etc.127.826.283358.584
10Unloading of metal in truck, dumper etc.127.813.141679.292
11Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.127.8415239.8
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work127.881.210377.36
13Collection of soft moorum including stacking at quarry.127.8112.814415.84
14contingency117971797
Total Activity 453000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL101.3650050680
2CEMENT(BEGS)730290211700
3Centering and Shuttering14495.713780.8
4contangency and work charges117851785
5Mason (semi skilled)182003600
6sand cum51.8466534473.6
7Transportanion of hard Muram127.840.145129.892
8Transportanion of sand51.84149.767763.5584
9transpotation of matel101.36166.416866.304
10Vibrator (Per Day)115.210011520
Total Material 358000