S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 5000 | 5000 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 285.41 | 66.6 | 19008.306 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 86.48 | 121.5 | 10507.32 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 17.26 | 2529.4 | 43657.444 |
6 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 31.18 | 2447.5 | 76313.05 |
7 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:4 (1cement, 4sand) | 159.1 | 74.2 | 11805.22 |
8 | Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Lift from 1.5 m. to 2.00 m. | 16.58 | 219.2 | 3634.336 |
9 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 16.58 | 75.3 | 1248.474 |
10 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum | 16.58 | 97.8 | 1621.524 |
11 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.00 m. to 2.50 m. | 16.58 | 228.1 | 3781.898 |
12 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 2.50 m. to 3.00 m. | 16.58 | 237 | 3929.46 |
13 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 3.00 m. to 3.50m. | 16.58 | 245.9 | 4077.022 |
14 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.50 m. to 6.00 m. | 16.58 | 290.4 | 4814.832 |
15 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 3.50 m. to 4.00 m. | 16.58 | 254.9 | 4226.242 |
16 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 4.00 m. to 4.50 m. | 16.58 | 263.7 | 4372.146 |
17 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 4.50 m. to 5.00 m. | 16.58 | 272.6 | 4519.708 |
18 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 5.00 m. to 5.50 m. | 16.58 | 281.5 | 4667.27 |
19 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m. | 16.08 | 380.4 | 6116.832 |
20 | Earth work for well excavation-Hard rock requiring blasting lift from 6.50 m. to 7.00 m. | 16.08 | 391.2 | 6290.496 |
21 | Earth work for well excavation-Hard rock requiring blasting lift from 7.00 m. to 7.50 m. | 16.08 | 402 | 6464.16 |
22 | Earth work for well excavation-Hard rock requiring blasting lift from 7.50m. to 8.00 m. | 9.04 | 412.8 | 3731.712 |
23 | Earth work for well excavation-Hard rock requiring blasting lift from 8.00 m. to 8.50 m. | 9.04 | 423.6 | 3829.344 |
24 | Earth work for well excavation-Hard rock requiring blasting lift from 10.50 m. to 11.00 m. | 9.04 | 480.6 | 4344.624 |
25 | Earth work for well excavation-Hard rock requiring blasting lift from 8.50 m. to 9.00 m. | 9.04 | 434.4 | 3926.976 |
26 | Earth work for well excavation-Hard rock requiring blasting lift from 9.00 m. to 9.50 m. | 9.04 | 445.2 | 4024.608 |
27 | Earth work for well excavation-Hard rock requiring blasting lift from 9.50 m. to 10.00 m. | 9.04 | 456 | 4122.24 |
28 | Earth work for well excavation-Hard rock requiring blasting lift from 10.00 m. to 10.50 m. | 9.04 | 466.8 | 4219.872 |
29 | Earth work for well excavation-Hard rock requiring blasting lift from 11.00 m. to 11.50 m. | 9.04 | 494.4 | 4469.376 |
30 | Earth work for well excavation- Hard rock requiring blasting lift from 11.50 m. to 12.00 m | 9.04 | 508.2 | 4594.128 |
31 | Earth work for well excavation-Hard rock requiring blasting lift from 12.00 m. to 12.50 m. | 9.04 | 522 | 4718.88 |
32 | Earth work for well excavation-Hard rock requiring blasting lift from 12.50 m. to 13.00 m. | 9.04 | 535.8 | 4843.632 |
33 | Earth work for well excavation- Hard rock requiring blasting lift from 13.00 m. to 13.50 m. | 8.67 | 549.6 | 4765.032 |
34 | Earth work for well excavation-Hard rock requiring blasting lift from 13.50 m. to 14.00 m. | 8.67 | 563.4 | 4884.678 |
35 | Earth work for well excavation-Hard rock requiring blasting lift from 14.00 m. to 14.50 m. | 7.95 | 577.2 | 4588.74 |
36 | Earth work for well excavation-Hard rock requiring blasting lift from 14.50 m. to 15.00 m. | 7.95 | 591 | 4698.45 |
37 | Extra rates for quantities of work executed . in or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 0.02 | 54285 | 1085.7 |