State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKHURD(P)
Work Code: 1703004070/RC/22012034304004 (sadak sudur sampark jatarthi se dongarpur ki or bhagwan lal ke khet tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/10/2015 Work start date : 28/1/2016
Present status : Earthern road Proposed Status : Mitti Murram Road
Tech Sanction Details
Technical Sanction No. : 70/46577 Sanction Date : 22/1/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
699831 687169 0 0 0 0 0 688000 0 1387000
Financial Sanction Details
Financial\Administrative Sanction No: 70/039 Financial\Administrative Sanction Date 27/1/2016
Fin. Sanc. Amt. (in Rs) NREGA:1387000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1387000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.72004.129520
2Contingency12100021000
3Dag-beling-Single spade stroke minimum 75mm deep12000.3360
4Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.1788100.53179747.64
5Transportation of sand720200.61144439.2
6Transportation rates for Masonry stone.7.53713.227849
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.396167.3166254.76
8Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil720011.280640
9Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.178844.779923.6
10Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia28426.211933.6
11Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural540444.4239976
12Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making202.533.26723
13Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact178838.468659.2
14Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)39650.620037.6
15Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:180504.890864
16Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work202.588.417901
17Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil5500025000
18Collection of soft moorum including stacking at quarry.1788122.8219566.4
19Collection of hard moorum including stacking at quarry.396142.556430
Total Activity 1387000
S.NoMaterialQuantityUnit PriceTotal
140 MM Metal Transportation720158.22113918.4
2Bolder56003000
3Compaction of Muram209485.6101490.4
4contengency no138310.7538310.75
5Display board150005000
6P V C PIPE303640.8109224
7piching stone transport396125.0149503.96
8Roller16210033600
9TANKER TRIPP17150025500
10Transpotation of Mooram178860.57108299.16
Total Material 588000